How long is the delivery lead time? Is rush order available?
- Production: Generator bodies, control panels, canopy fabrication, and load testing are done in-house
- Engine sourcing: We install genuine Cummins, Perkins, Yuchai, Weichai, etc., with original brand warranty
- Export: Our own foreign trade team manages documentation, inspection, and logistics — no external agent
- Factory-direct pricing — no trader margin added
- Strict QC — every genset passes 2-hour no-load + load test before shipment
- Faster response — engineering and sales under one roof
- OEM/ODM supported — voltage, frequency, canopy, ATS, parallel system customizable
🌍 We export directly to Asia, Africa, the Middle East, South America, and Europe.
✅ In short: We are a direct factory with our own export department — you deal with the maker, not a middleman. Better price, better control, better after-sales.
- For complex machinery, production lines, or electrical systems, we can send engineers to your site to handle unloading guidance, mechanical/electrical installation, alignment, wiring check, and first-run commissioning.
- Installation supervision
- Mechanical & electrical connection guidance
- Calibration and parameter setting
- Trial run and performance testing
- Operator training (basic operation & daily maintenance)
- Civil works, foundation construction, crane rental
- Local labor, scaffolding, power supply beyond equipment interface
- Long-term resident engineers (available on monthly basis if required)
Supervision & Commissioning Service, covering:
- Round-trip air tickets
- Visa & local transportation
- Accommodation (or client provides)
- Daily service fee (USD/day)
- Machine model / project scale
- Destination country & site readiness (power, foundation, local labor)
- Whether you prefer full on-site service or remote guidance only
✅ In short: Yes, on-site installation & commissioning is available for qualified equipment. It is optional and quotable separately under FOB/CIF, or bundled into turnkey/DDP projects upon request.
- 10 kW set: ~2.6 – 3.2 L/h at full load
- 50 kW set: ~13 – 16 L/h at full load
- 100 kW set: ~25 – 31 L/h at full load
- 200 kW set: ~50 – 62 L/h at full load
- 500 kW set: ~125 – 155 L/h at full load
- 1000 kW set: ~250 – 310 L/h at full load
- 25% load: ~0.30 L/kW·h equivalent (high specific consumption)
- 50% load: ~0.27 L/kW·h
- 75% load: ~0.25 L/kW·h
- 100% load: ~0.25 – 0.32 L/kW·h depending on engine
- Engine tech: Electronic injection < mechanical injection
- Altitude & ambient temp: High altitude or >40°C reduces air density, raises fuel use
- Maintenance status: Clogged filters, bad injectors increase burn by 5%–15%
- Fuel quality: Low calorific value diesel raises L/h
- Governor type: Electronic governor stabilizes consumption better
- Genset model & prime/standby power
- L/h at 25% / 50% / 75% / 100% load
- Tank capacity & estimated run time at full load
- Optional enlarged base tank or external daily tank sizing
- Required kW / kVA (prime or standby?)
- Expected average load percentage in your application
- Daily running hours (continuous / emergency only)
- Diesel grade used locally
✅ In short: Fuel use is model-specific, but you can expect about 0.25–0.32 liters per kWh at full load, lower per-kWh at 70–80% load. We provide a load-based consumption table with every offer so you can calculate running cost before purchase.
- Whole generator set (frame, canopy, ATS, control panel): 12 months / 1000 running hours
- Engine (Cummins / Perkins / Yuchai / Weichai etc.): Follows original engine manufacturer warranty — usually 12–24 months or up to 2000 running hours
- Alternator (Stamford / Marathon / Leroy-Somer / Mecc Alte etc.): 12–24 months depending on brand policy
- Consumables (oil, fuel filters, air filters, belts, batteries): Not covered
- Manufacturing defects in material and workmanship
- Non-human-caused failures of major components
- Free replacement parts (EXW our factory or FOB loading port)
- Remote technical support and troubleshooting during warranty period
- Damage caused by improper installation, wrong voltage, overload, or lack of maintenance
- Wear-and-tear parts and routine consumables
- Issues caused by using non-recommended diesel grade or poor site conditions
- 18-month / 1500-hour warranty
- 24-month / 2000-hour warranty
- On-site spare parts kit bundled with extended service contract
- Provide genset serial number + photos/videos of the issue
- Our engineer reviews within 24–48 hours
- Free parts sent by DHL/FedEx, or local agent support if available in your country
🌍 Regional Note: For markets with local service partners (e.g., Nigeria, Kenya, UAE, Indonesia, Peru), warranty claims can often be handled faster through regional agents.
- Prime or standby application?
- Expected annual running hours
- Whether you want standard or extended warranty included in the price
✅ In short: Default warranty is 12 months or 1000 running hours for the whole set, with engine/alternator following original brand policy. Extended packages are available. We focus on fast claim response, not just long paper warranty.
- Remote technical support: 24-hour response via Email, WhatsApp, WeChat, or video call for fault diagnosis and operational guidance
- Spare parts supply: Original and OEM-quality parts for engines, alternators, controllers (Deep Sea, SmartGen), ATS, fuel systems, and cooling systems
- Warranty execution: Fast processing of warranty claims with free replacement parts for quality-related issues
- Commissioning follow-up: Optional post-installation inspection after the first 100 running hours or 1 month of operation
- Operator training: On-site or remote training covering daily maintenance, fault code interpretation, safe start/stop procedures, and basic troubleshooting
- Documentation package: English operation manual, electrical schematic diagram, spare parts catalog, factory load test report, and CE/ISO certificates included with every shipment
- Local agent support: In key markets such as Nigeria, Kenya, UAE, Saudi Arabia, Indonesia, Thailand, Peru, and Chile, we coordinate with local service partners for faster on-site response
- Remote-first model: For other regions, our factory engineers provide real-time remote guidance, minimizing downtime while parts are in transit
- Annual maintenance contracts (AMC): Available for industrial plants, data centers, rental companies, and infrastructure projects requiring planned preventive maintenance
- Oil filter, fuel filter, primary fuel filter, air filter
- Fan belt, V-belts, tensioner
- Common sensors (coolant temperature, oil pressure, speed sensor)
- Fuses, relays, and AVR (for brushless alternators)
- Critical seals and gaskets
- Pre-sales & order support: Same-day reply
- Technical inquiry after delivery: Within 24 hours (working days)
- Urgent breakdown support (prime power users): Initial remote response within 12 hours
- Spare parts dispatch: Within 3 working days after claim approval, shipped via DHL/FedEx/UPS (typical delivery: 3–5 days globally)
- Genset model and serial number
- Controller model and displayed fault codes (with photo if possible)
- Operating environment (altitude, ambient temperature, load profile)
- Brief description of symptoms and recent maintenance history
✅ In short: Yes — we deliver end-to-end after-sales service: remote troubleshooting, global spare parts supply, warranty handling, optional local agent coordination, and long-term maintenance solutions. Our commitment is simple: we don’t just sell generators; we keep them running.
- Product overview, rated parameters, and nameplate explanation (kW/kVA, voltage, frequency, power factor)
- Start-up / shut-down procedures for manual, auto, and ATS modes
- Control panel guide (Deep Sea / SmartGen / Harsen etc.): button functions, alarm codes, parameter setting
- Daily / weekly / monthly maintenance checklist (oil, filters, coolant, battery, belt inspection)
- Troubleshooting table with fault code list and corrective actions
- Safety warnings, grounding requirement, and emergency stop procedure
- Main AC output diagram (generator terminals U/V/W/N/PE → ATS / distribution panel)
- Control panel internal wiring diagram
- ATS control wiring diagram (when equipped)
- Battery, starter, and alternator excitation wiring
- Sensor wiring (oil pressure, water temperature, speed, fuel level)
- Canopy lights / sockets / optional remote start wiring (for silent & container types)
- Printed: 1–2 bound copies placed in the control box or spare-parts crate
- PDF: sent by email / WeTransfer / WhatsApp before or right after shipment
- CAD version (DWG / EPLAN): available on request for EPC / consultant teams doing site integration
- Default: English
- Spanish / Arabic / French / Russian available on request
- Diagrams follow IEC / NEC marking conventions with clear terminal numbers and phase colors
If your unit is built to a non-standard spec (e.g. 480V/60Hz, 415V/50Hz, single-phase derivative, parallel system, synchronized ATS), the manual and diagram shipped will match your exact order configuration — not a generic model booklet.
Before connecting to the grid or ATS, always cross-check the diagram against the actual controller label and terminal board. You can send us a photo of the nameplate + controller model and we’ll confirm the matching page of the diagram.
✅ In short: Yes — you get a model-specific English instruction manual + full wiring diagrams (printed + PDF) with every genset, and CAD source files if your project needs them.
- Stock / hot-selling models (e.g. 50kW / 100kW / 200kW silent type with Cummins/Yuchai): 7–12 working days dispatch
- Standard open/silent type, 10–500kW: 20–25 working days
- Containerized / trailer / parallel system / ATS + synchronization: 30–45 working days
- Special specs (480V/60Hz, high-voltage 6.6kV, explosion-proof, mining package): 35–55 working days
- Sea freight (FOB/CIF): 15–35 days depending on destination
- Express slot: We can shorten standard production to 12–15 working days for 1–3 standard units
- Stock-engine priority: If we have your engine (Cummins/Perkins/Yuchai/Weichai) and alternator (Stamford/Mecc Alte) in stock, silent canopy build + wiring + test can be done in ~10 working days
- Rush fee: Normally 3%–8% of order value, confirmed case by case
- Pre-built semi-finished units: We keep bare frames, canopies, and control panels in process to cut 5–7 days
- Ocean transit time (cannot be compressed beyond express freight options)
- Third-party inspection (SGS/BV) if their engineer availability is tight — book early
- Custom certifications (CE for special markets, SASO, SONCAP) if not pre-prepared
- Exact model / kW-kVA / prime or standby
- Voltage-frequency-phase (380V/50Hz or 480V/60Hz etc.)
- With or without ATS, parallel, trailer, container
- Destination port (for total landed time)
- Whether you accept stock-engine substitution to save time
✅ In short: Standard lead time is 20–35 working days after deposit; stock units ship in 7–12 days. Rush orders can be compressed to 10–15 working days with a small expedite fee, subject to parts availability. We always give a written estimated dispatch date in the PI — no vague "about one month" promises.
For checking suitable generator product for your project — Contact NovArk Power
Get a free power system design consultation for your diesel generator set project. Our engineers will analyze your requirements and deliver a tailored generator solution.
This article is for informational purposes only. Specifications and availability may vary by region. Please contact NovArk Power for a confirmed quotation tailored to your project requirements.