Professional Generator Set Manufacturer

NovArk Power Security Solution for Computing Power Center

High altitude driving, electric escort
Home / NovArk Power Security Solution for Computing Power Center

Overview

Computing power is the lifeline, and electricity is its cornerstone

In the area of AI and big data, computing power centers are the heart of the digital economy. An unexpected power outage not only means the expensive GPU cluster will shut down, but may also result in months of training results being wasted. NovArk Power understands the strict requirements of the computing power center for "zero interruption, fast deployment, and low threshold" in power. We provide a one-stop power guarantee solution from design, installation to operation and maintenance to ensure the sustainable online operation of your core business.

Key question

Is your computing data center generator project facing these challenges?

Computing centers of different scales all face four common core pain points:
1

The lifeline of data security

Traditional units start slowly (>30 seconds) and cannot meet the endurance window of server UPS; Large voltage fluctuations pose a threat to precision equipment; When multiple machines are connected in parallel, the synchronization is poor, which can easily lead to circulating currents and cause downtime.

2

Every inch of land is valuable

Computing centers are often located in high-rise or basement areas of the park, and standard units have a large volume, making it difficult to pass through narrow passages and freight elevators; The pipelines in the computer room are dense and the layout is difficult; The basement also faces challenges in load-bearing and ventilation.

3

Bottleneck of Computing Power Growth

Parallel debugging technology is complex and requires expert on-site operation; During expansion, it is often necessary to shut down for renovation, which directly affects business continuity and customer SLA.

4

Hidden thresholds for compliance

The noise generated by the operation of the unit can easily lead to complaints from surrounding areas; Exhaust emissions must comply with increasingly strict local and international environmental regulations; High carbon emissions affect corporate ESG ratings.

5

Unstable Continuous Power Supply

Sudden power loss from generator malfunctions leads to severe losses: mining production halts with daily losses over 500,000 RMB, communication signals cut off, and geological survey data permanently lost.

Solution

NovArk Power's four core capabilities, precise breakthrough

We provide a complete solution that is factory integrated and ready to use, targeting the aforementioned pain points.

Millisecond level response, guarding core data:

A high-performance control system that completes switching within less than 10 seconds after a power outage, seamlessly connecting to UPS.

Silent and Clean Emissions:

Optional DPF (diesel particulate trap) and SCR (selective catalytic reduction) systems can be used to effectively reduce particulate matter (PM) and nitrogen oxide (NOx) emissions, meet strict environmental regulations in mainstream global markets, and support the use of biodiesel to further reduce carbon footprint.

Cloud monitoring:

Comes standard with 4G module, supports remote diagnosis, program upgrades, and reduces on-site maintenance.

Remote Intelligent O&M System:

Supports real-time remote monitoring, automatic fault alarm and unattended operation. Greatly cuts frequent on-site inspection costs for remote wind farms, mines and communication base stations.

[Zero Interruption Power Supply]

Stable Parallel Connection · Millisecond Switching

Stable Parallel Connection:

Supports multi-unit hot parallel with intelligent load sharing control. Tiny circulating current between parallel modules, no cross-interference fault risk. N+1/2N redundant architecture enables online single-unit maintenance without cutting off computing power loads, supporting flexible capacity expansion for growing computing clusters.

Millisecond-Level Switching:

Full solid-state static transfer design achieves power source switching within ≤2ms. Instant response upon mains voltage sag, surge or blackout. Zero power interruption for GPU servers, no task crash or data loss during power switching.

Double-Layer Power Safety Guarantee:

Parallel redundancy eliminates single-point failure, while millisecond fast switching fills power gap before diesel generators start. Combined protection avoids both long-duration outages and instantaneous power fluctuation risks, meeting Class A data center power reliability standards.

Computing data center Generator Set Solution — 3 Key Points

  • Ultra-High Power Supply Reliability & Redundant Architecture:

    Designed for IDC 7×24h uninterrupted operation, the generator set adopts N+1/N+2 redundant parallel backup configuration. It supports seamless ATS automatic switching, completing power takeover within 10 seconds after mains failure to eliminate service downtime. With strict transient voltage & frequency stability control, it limits voltage fluctuation within ±1% to adapt to high-precision IT load and server power demand, fully compliant with Tier 3/Tier 4 data center power supply standards. The distributed parallel control system avoids single-point failure and ensures continuous and stable power supply for core computing equipment.

  • Intelligent Unattended & Data Cloud Monitoring:

    Equipped with industrial-grade intelligent control system, the unit supports remote real-time data monitoring, automatic start/stop, load adjustment and fault self-diagnosis. It realizes unattended 24-hour operation, with automatic alarm and record for abnormal parameters such as temperature, oil pressure and overload. Supporting multi-unit parallel operation, load sharing and remote cloud management, it adapts to centralized management of large-scale computer room clusters. It also reserves data interface to dock with data center BMS/EMS system, realizing integrated linkage of power equipment and room environment.

  • Low Noise & High Efficiency Green Energy-Saving Design:

    Adopts professional silent damping enclosure and multi-stage muffler system, effectively suppressing unit operating noise to meet urban data center environmental protection noise standards. Optimized fuel injection and combustion system greatly reduce fuel consumption and exhaust emissions, matching data center low-carbon and energy-saving operation requirements. The highly integrated modular structure saves floor space, shortens installation and commissioning cycle, and reduces later operation and maintenance costs. It supports long-term continuous full-load operation, adapting to the high-load and long-duration working conditions of computing center power backup scenarios.

[Scenario based installation]

Shockproof Fixing & Full Equipment Protection

Multi point rigid fixation of the base:

The chassis of the unit and the flatbed truck are locked with high-strength wire tighteners and anti slip support blocks, and rubber shock pads are laid at the bottom to strictly control the displacement of bumps and prevent pipelines, heat sinks, and control cabinets from being bumped and cracked.

Field Base Station:

Modular disassembly (power/control/cooling unit), suitable for mountainous/desert scenarios without lifting ports, manual handling and assembly.

Core Equipment Room:

Ultra thin parallel cabinet (depth ≤ 60cm)+customized heat dissipation duct (hot air leads to the outside) to avoid affecting the temperature and humidity of the computer room.

Global Certification and Low Disturbance Operation of Compliance Assurance System

Low Noise and Low Emission:

Modular disassembly (power/control/cooling unit), suitable for mountainous/desert scenarios without lifting ports, manual handling and assembly.

Global Certification:

Certified by CE/UL/SONCAP, providing ITU-T communication industry standard documents and supporting overseas bidding.

Core Technology Characteristics & Data Center Load Adaptation

Ultra-Fast Millisecond Switching & Zero Interruption Adaptation

  • Core Feature:

    Supports ≤2ms seamless power switching during mains failure, voltage sag and surge impact. It eliminates power gap and transient power loss through instantaneous energy compensation.

  • Data Center Load Adaptation:

    Fully adapts to high-sensitive GPU/AI computing loads. Avoids computing task breakdown, suspended training jobs and server reset caused by instantaneous grid fluctuation, ensuring continuous operation of large-scale cluster computing.

Stable Parallel Redundancy & Dynamic Load Adaptation

  • Intelligent management of mixed oil:

    Automatic proportioning+deterioration warning to avoid equipment damage.

  • Compact deployment:

    The urban base station covers an area of ≤ 5 square meters, and the core computer room has ultra-thin parallel cabinets (depth ≤ 60cm).

High Light-Load Efficiency & High-Density Load Optimization

  • Noise control:

    Third party testing report (such as 62dB (A) noise in urban base station cases), in compliance with standard.

  • Emission certification:

    National VI/Euro V/EPA Tier 4 Final, providing carbon footprint report (ESG compliance).

Compliance and Certification System

Product Series and Scenario Selection Guide Product Model Genealogy and Core Parameter Table

Brand(kw)ApplicationCore FeaturesProtection levelNoise(dB)Temperature adaptation range
NovArk-D5050Small base stations inurban areasCompact soundproof speaker, basic vibration isolation, oneclick start stopIP55≤68-10℃~40℃
NovArk-D200200Field base station / data centerQuadruple dust prevention + intelligent parallel connection + remote monitoringIP66s65-30°℃~50℃
NovArk-D500500Core Exchange Center / Overseas NodeN+1 redundancy + DPF + SCR+multi voltage switchingIP66562-30℃~50℃

Suggestions for Scene Selection

Application scenariosCore requirementsNovArk Recommended Configuration
Urban base stationLow noise,compact, and lifting freeModel: NovArk-D50 (Compact Edition) Features: Floor area ≤ 5 ㎡+Split transportation+≤ 65dB (A) Noise service: Nighttime construction plan
Field base station (high mountain/desert)Resistant to low temperature / high dust, easy to transportModel: NovArk-D200 (weather resistant version) Features: quadruple dustproof+electric heating start+modular disassembly Accessories: nano filter cartridge (2000 hours lifespan))
Core Exchange CenterMulti machine parallel connection, low interferenceModel: NovArk-D500 (parallel version) Features: Deep sea parallel controller+Voltage deviation ≤± 2%+EMC shielding
Overseas communication nodesMultiple certifications and local complianceModel: NovArk-D500 (International Edition) Certification: CE/UL/SONCAP Features: Multi voltage switching+anti salt spray coating

Industry Case Verification

Case 1

A certain AI computing power center (Changsha, Hunan,China)

Challenge: The 800kW large computing power center requires extremely high power continuity, and any interruption will result in the failure of AI model training tasks worth millions of dollars.

Solution:

  • High reliability configuration: Deploy 2 400kW Cummins engines+Stanford brushless generators to ensure pure and stable power and electrical output.

  • Intelligent parallel system: Adopting a deep-sea digital parallel control system, it realizes the "one key parallel connection" of two units, automatically and accurately distributes loads, and completely eliminates the risk of circulating current.
  • Seamless switching guarantee: The entire system is deeply integrated with the customer's existing UPS, ensuring that in the event of a power outage, the backup power supply can be taken over before the UPS battery runs out.

Achievement:

Achieved zero interruption operation for 18 months, successfully responded to multiple fluctuations in the electricity supply, ensured the smooth completion of core AI training tasks for customers, and achieved a 100% SLA achievement rate for customers.

Case 2

A edge computing node (Inner Mongolia)

Challenge: 300kW edge node, located in an extremely cold environment of -30 ℃, difficult to start in winter; Simultaneously adjacent to residential areas, it must meet strict noise standards of<65dB (A).

Solution:

  • Extreme cold adaptability: Adopting a 300kW containerized unit, integrated with fuel preheating, coolant heating, and battery insulation system, ensuring reliable start-up within 10 seconds at -30 ℃ low temperature.
  • Ultra quiet design: The container walls are filled with high-density soundproof cotton, and the intake and exhaust ducts adopt a maze type noise reduction structure, with high-efficiency mufflers installed to reduce the operating noise to 63dB (A).
  • Integrated delivery: The unit is fully integrated and tested in the factory, and after arriving at the site, it can be lifted, wired, and debugged in just 3 days, greatly reducing the deployment cycle.

Achievement:

Stable operation for over a year in an extremely cold environment of -30 ℃, with fully compliant noise levels and no complaints from surrounding residents, solving the customer's dual problem.

Operations and Emergency Support

Remote Operation and Maintenance:

24/7 cloud platform monitoring, automatic fault push (including graphic and text processing guide), AI prediction of mixed oil deterioration and filter blockage.

Quick Response:

Arrive within 48 hours domestically (24 hours in first tier cities), arrive within 72 hours overseas; Exclusive maintenance window for urban base stations (2-5 am).

Spare Parts Guarantee:

6 major spare parts warehouses nationwide (Beijing, Shanghai, Guangzhou, Shenzhen, Chengdu, Wuhan)+overseas warehouses (Singapore/Frankfurt), with core components (controllers/filters) arriving within 72 hours.

Training Support:

Provide multilingual (Chinese/English/French) operation videos, graphic manuals, and on-site training (for operation and maintenance personnel) covering installation and parallel debugging.

FAQ

Your Most Concerned Question Is as Follows

  • Can you provide packing list, bill of lading and commercial invoice?
    We supply complete and compliant export documentation, including commercial invoices, packing lists, transport documents and certificates required for international customs clearance.
  • What international certifications do you have? Is customs clearance available?
    Our products are certified with CE, ISO, GCC and CCC standards, providing compliance for major international markets and supporting smooth customs clearance and project approval processes.
  • Is the quotation based on FOB, CIF or EXW terms?
    We provide flexible quotations under EXW, FOB and CIF terms, with transparent cost breakdowns and customized logistics solutions to meet different international trade requirements.
Power That Never Stops When Darkness Falls, NovArk Powers Through
Our company was established in 2013 and consists of four branches nationwide. As one of the leading OEM manufacturers of diesel generators in China, we have earned a strong reputation and multiple awards over the years, meeting diverse requests from markets around the world.