Professional Generator Set Manufacturer

NovArk power Mobile power guarantee solution for diesel generator sets

Full scene adaptation, zero interruption communication, intelligent compliance operation and maintenance
Home / NovArk Power Mobile power guarantee solution for diesel generator sets

Overview

Modular unit eases frequent site transfer

Frequent relocation leads to low efficiency: In construction, mining, agriculture and other scenarios, the work location changes frequently, and ordinary fixed units are difficult to transfer quickly. Each relocation requires rewiring and debugging, which consumes time and manpower (refer to the engineering operation vehicle [engineering operation vehicle solution] "compact modular design (single weight ≤ 300kg)+manual handling and assembly" to solve the problem of moving in narrow spaces).

Key question

Is Your Project Facing These Challenges?

The diversity of project on-site environment (outdoor/urban/overseas) and the superposition of core pain points bring about six core issues:
1

Frequent Site Relocation

Construction, mining and farm sites shift regularly. Traditional fixed generators are hard to transport. Every move needs repeated wiring, commissioning and testing, wasting plenty of labor hours and dragging down overall construction efficiency severely.

2

Narrow & Confined Working Spaces

Many job sites have limited passageways and small operation areas. Oversized fixed units cannot pass through narrow lanes. Lifting tools are unavailable, making equipment transfer and layout arrangement extremely difficult for crews.

3

Slow Emergency Power Response

Sudden grid outages happen often on projects. Conventional generators take long to disassemble, deliver and install. Long power cut periods halt construction work, trigger equipment shutdowns and cause costly project schedule delays.

4

High Labor & Handling Costs

Heavy fixed generator units rely on cranes and multiple workers to move. Frequent transfers add extra manpower and machine rental fees. Repeated assembly and debugging further push up comprehensive construction operating expenses.

5

Unstable On-site Power Supply

Remote job sites lack stable mains power. Ordinary generators fail to deploy fast when power demand surges. Fluctuating power supply damages construction machinery, leads to frequent breakdowns and reduces work productivity.

Solution

NovArk Power Mobile Diesel Generator Set – Four Core Systems

Environmental Weather Resistance Adaptation:Full protection against extreme environments

Compact Modular Transport System:

Single module weighs no more than 300kg and supports manual disassembly and carrying. It adapts to narrow construction passages without cranes, greatly cutting relocation time, repeated wiring and debugging labor amid frequent site transfers.

Stable Power Output Control System:

Intelligent voltage and frequency regulation module stabilizes output under variable load. It avoids power fluctuation damage to construction equipment, delivers continuous reliable power for mining, agriculture and temporary engineering projects.

Quick Assembly & Wiring System:

Standardized quick-connect wiring terminals eliminate complicated cabling work. Operators finish unit assembly and power connection within minutes after relocation, drastically shortening pre-operation preparation cycle for field works.

All-Terrain Mobile Chassis System:

Integrated lightweight mobile chassis fits complex construction terrains including mountain and muddy sites. It enables flexible short-distance movement on site, solving the transfer difficulty of traditional heavy fixed generator equipment.

[Zero Interruption Power Supply]

Intelligent Monitoring & Protection System

Real-time data monitoring:

Continuously tracks voltage, frequency, oil temperature, water temperature and load data, displaying running status intuitively for onsite staff to check operating conditions anytime.

Multiple automatic safety protection:

Built-in overload, overheat, low oil pressure and short-circuit protection functions; the unit will automatically shut down to avoid component burnout when abnormal conditions occur.

Remote early warning reminder:

Supports abnormal fault alarm prompts, quickly reminding operators to troubleshoot hidden dangers, lowering maintenance costs and extending the service life of the generator set.

Intelligent Operation and Maintenance Cost Reduction: Remote Monitoring and Proactive Warning

  • 4G Cloud Operation and Maintenance Platform:

    Real time monitoring of fuel level/voltage/fault codes through mobile app AI predicts filter element blockage and belt wear (7 days advance push reminder).

  • Mixed Oil Management:

    Equipped with an intelligent fuel mixing module (automatically proportioning diesel/biodiesel) to prevent equipment from deteriorating and damaging; Remote monitoring of oil level (automatic alarm for low oil level).

  • Low-Cost Maintenance:

    Spare parts cost price supply (filter element/belt), remote diagnosis reduces on-site inspections by 90%, annual operation and maintenance costs reduce by 30%.

[Scenario based installation]

Modular and Split Transportation

Split Modular Design:

Single module ≤300kg, movable by manpower without cranes, adapting to narrow construction passages.

Field Base Station:

No complicated tools required, greatly shortening relocation and wiring debugging time.

Separated Components :

Components are easy to transport on small vehicles, solving transfer troubles for frequently shifting mining, construction and agricultural sites.

Global Certification and Low Disturbance Operation of Compliance Assurance System

Low Noise and Low Emission:

Modular disassembly (power/control/cooling unit), suitable for mountainous/desert scenarios without lifting ports, manual handling and assembly.

Global Certification:

Certified by CE/UL/SONCAP, providing ITU-T communication industry standard documents and supporting overseas bidding.

Core Technology Characteristics and Communication Load Adaptation

Environmental weather resistance and power supply stability technology

  • Extreme environmental protection:

    Salt spray (316L shell+triple anti paint), high dust (quadruple anti dust), low temperature (-30 ℃ electric heating start) fully compatible.

  • Parallel synchronization technology:

    The digital parallel controller automatically distributes the load, eliminates circulating current, and ensures that the voltage deviation of multiple parallel machines is ≤ ± 2%.

Intelligent operation and scene adaptation technology

  • Intelligent management of mixed oil:

    Automatic proportioning+deterioration warning to avoid equipment damage.

  • Compact deployment:

    The urban base station covers an area of ≤ 5 square meters, and the core computer room has ultra-thin parallel cabinets (depth ≤ 60cm).

Compliance and Low Disturbance Technology

  • Noise control:

    Third party testing report (such as 62dB (A) noise in urban base station cases), in compliance with standard.

  • Emission certification:

    National VI/Euro V/EPA Tier 4 Final, providing carbon footprint report (ESG compliance).

Compliance and Certification System

Product Series and Scenario Selection Guide Product Model Genealogy and Core Parameter Table

Brand(kw)ApplicationCore FeaturesProtection levelNoise(dB)Temperature adaptation range
NovArk-M5050Small base stations inurban areasCompact soundproof speaker, basic vibration isolation, oneclick start stopIP55≤68-10℃~40℃
NovArk-M200200Field base station / data centerQuadruple dust prevention + intelligent parallel connection + remote monitoringIP66s65-30°℃~50℃
NovArk-M500500Core Exchange Center / Overseas NodeN+1 redundancy + DPF + SCR+multi voltage switchingIP66562-30℃~50℃

Suggestions for Scene Selection

Application scenariosCore requirementsNovArk Recommended Configuration
Urban base stationLow noise,compact, and lifting freeModel: NovArk-M50 (Compact Edition) Features: Floor area ≤ 5 ㎡+Split transportation+≤ 65dB (A) Noise service: Nighttime construction plan
Field base station (high mountain/desert)Resistant to low temperature / high dust, easy to transportModel: NovArk-M200 (weather resistant version) Features: quadruple dustproof+electric heating start+modular disassembly Accessories: nano filter cartridge (2000 hours lifespan))
Core Exchange CenterMulti machine parallel connection, low interferenceModel: NovArk-M500 (parallel version) Features: Deep sea parallel controller+Voltage deviation ≤± 2%+EMC shielding
Overseas communication nodesMultiple certifications and local complianceModel: NovArk-M500 (International Edition) Certification: CE/UL/SONCAP Features: Multi voltage switching+anti salt spray coating

Industry Case Verification

Case 1

Emergency rescue team of a certain province (emergency rescue scenario)

Challenge: Rapid deployment of power is required at the rescue site. The relocation of fixed units takes 3 hours per time, and emergency start-up is slow (>30 seconds), which delays rescue efforts.

Solution:

  • Unit configuration: Deploy NovArk-M200 (modular trailer model), using container packaging (IP67 protection)+hydraulic shock absorber trailer (all terrain tires);

  • Intelligent control: 4G cloud operation and maintenance platform for real-time monitoring, AI predictive maintenance (filter replacement cycle);
  • Power selection: diesel drive (Cummins engine, 8-hour range)+supercapacitor backup (refer to the "Emergency Backup Plan" of the Engineering Operation Vehicle [Engineering Operation Vehicle Solution]).

Achievement:

 The single relocation time has been reduced to 30 minutes, emergency response time ≤ 10 seconds, participation in 15 rescue operations with zero delay, and awarded the title of "Emergency Support Benchmark Unit".

Case 2

Temporary power supply project for a mine in Southeast Asia (mining scenario)

Challenge: The mining operation points are scattered (relocated twice a month), the original unit has a large volume (occupying more than 8m ²) and cannot enter the narrow mine passage. Malfunctions occur frequently under high temperature and high humidity (annual average temperature of 30 ℃, humidity of 80%).

Solution:

  • Unit configuration: NovArk-M150 (compact modular type), split transportation (single weight 280kg)+plug and play interface;
  • Localization support: English/local language installation guide+WhatsApp video guide (refer to "Localization Deployment Support").
  • Environmental adaptation: anti salt spray coating (refer to "316L stainless steel shell" in the ocean ship [ocean ship solution])+high-temperature version radiator (heat dissipation area+30%, refer to "high-temperature heat dissipation" in the engineering operation vehicle [engineering operation vehicle solution]);

Achievement:

Flexible movement within the mine, continuous operation for 1 year with zero failures, and a 30% reduction in annual operation and maintenance costs.

Operations and Emergency Support

Remote Operation and Maintenance:

24/7 cloud platform monitoring, automatic fault push (including graphic and text processing guide), AI prediction of mixed oil deterioration and filter blockage.

Quick Response:

Arrive within 48 hours domestically (24 hours in first tier cities), arrive within 72 hours overseas; Exclusive maintenance window for urban base stations (2-5 am).

Spare Parts Guarantee:

6 major spare parts warehouses nationwide (Beijing, Shanghai, Guangzhou, Shenzhen, Chengdu, Wuhan)+overseas warehouses (Dubai,Algeria,Zimbabuware,Kyrgyzstan), with core components (controllers/filters) arriving within 72 hours.

Training Support:

Provide multilingual (Chinese/English/French) operation videos, graphic manuals, and on-site training (for operation and maintenance personnel) covering installation and parallel debugging.

FAQ

Your Most Concerned Question Is as Follows

  • Can you provide packing list, bill of lading and commercial invoice?
    We supply complete and compliant export documentation, including commercial invoices, packing lists, transport documents and certificates required for international customs clearance.
  • What international certifications do you have? Is customs clearance available?
    Our products are certified with CE, ISO, GCC and CCC standards, providing compliance for major international markets and supporting smooth customs clearance and project approval processes.
  • Is the quotation based on FOB, CIF or EXW terms?
    We provide flexible quotations under EXW, FOB and CIF terms, with transparent cost breakdowns and customized logistics solutions to meet different international trade requirements.