Yongfeng Industrial Base, Xibeiwang Town, Haidian District, Beijing — Diesel Generator Project

Yongfeng Industrial Base, Xibeiwang Town, Haidian District, Beijing — Diesel Generator Project
Case Study: Yongfeng Industrial Base, Xibeiwang Town, Haidian District, Beijing — Diesel Generator Project
From Fragmented Standby Power to a Unified, Intelligent Backup Power Infrastructure for a National-Level Science & Technology Park
01
Project Background: The Situation Before We Engaged
Client Profile
Yongfeng Industrial Base is a national-level science & technology park located in Xibeiwang Town, Haidian District, Beijing — the core hinterland of the Zhongguancun Science City. The base accommodates AI data centers, biotech R&D labs, headquarters office towers, and precision manufacturing workshops. With Beijing's extreme winter cold (down to -18°C) and strict municipal environmental regulations, the base required a standardized, centralized backup power solution across multiple buildings.
Pre-Engagement Pain Points
- Fragmented fleet: 23 standalone generators across the base, sourced from 9 different vendors over a decade. Brands, capacities, and fuel grades were inconsistent, making centralized maintenance nearly impossible.
- Cold-start failures: During Beijing's winter cold snaps, 6 units failed to start due to frozen fuel lines and weakened batteries. One incident left a biotech cold-storage lab without power for 40 minutes, risking ¥2M in biological samples.
- Slow manual switching: Most units lacked ATS; security patrols had to manually start generators, taking 4–8 minutes — far too long for data center UPS ride-through windows.
- Emission & noise constraints: Open units exceeded Beijing's Class-1 environmental noise limit (≤55 dB nighttime) and failed to meet the new GB 20891-2022 emission standard, triggering district EPA warnings.
- Zero visibility: No remote monitoring — property managers drove between buildings for daily inspections, and several units ran out of fuel unnoticed during extended outages.
02
Tender Purpose & Bidding Process
Tender Objectives
- ✓Fleet standardization: Unified brand, model, and tiered capacities (200 / 400 / 800 kVA) across all base buildings.
- ✓Cold-climate reliability: Guaranteed start at -20°C within 10 seconds, with battery warmers and fuel-line heaters as standard.
- ✓Fast auto-transfer: ATS integration achieving <8s transfer for data center and lab-critical loads.
- ✓Beijing environmental compliance: Silent canopy ≤70 dB(A) at 7m + Stage-V emission after-treatment (DOC+DPF+SCR).
- ✓Unified IoT platform: One cloud dashboard for the entire base fleet, with auto-alerts and monthly O&M reports.
Bidding Process
- Pre-qualification: 16 suppliers applied; 6 passed based on OEM authorization, Beijing municipal emission certification, and ≥3 data-center / lab projects in the capital region.
- Technical evaluation: Bidders submitted emission test reports, acoustic designs, cold-start schemes, and 5-year TCO models. We were the only bidder to include a -20°C cold-start validation protocol.
- On-site demonstration: Shortlisted vendors deployed units to Building B7 (data center) and Building C3 (biotech lab) for live cold-start and auto-transfer drills. Our units achieved 6.4s transfer — the fastest on record.
- Commercial bid: Evaluated within a framework budget of ¥8.6M. We won with the best comprehensive score (technical 44/45 + commercial 38/40 + demo 10/10).
- Award: Master framework signed for 23 units (tiered 200/400/800 kVA) + a centralized IoT monitoring platform + 5-year full-service SLA.
03
Post-Award Objectives
- ✓Zero critical-load interruption: Guarantee seamless backup for data centers, biotech labs, and HQ offices through Beijing's winter peaks.
- ✓Unified, visible fleet: One platform to monitor all 23 units' status, fuel, battery, and maintenance schedule.
- ✓Audit-ready compliance: Emission and noise reports on file for Beijing EPA and Haidian District inspections.
- ✓Scalable template: A standardized deployment blueprint reusable for future base expansions.
04
Why They Found Us
1. Capital-region mission-critical track record: We had deployed 60+ units to data centers and biotech parks across Beijing, with documented winter uptime >99.7%.
2. Cold-climate expertise: We correctly specified -20°C cold-start packages (block heaters, battery warmers, fuel-line heaters) — a detail competitors omitted.
3. Free pre-tender audit: Before the tender, we conducted a complimentary 72-hour load-mapping survey across all 23 sites, later adopted as the tender baseline.
4. Demonstrated speed & compliance: Our on-site demo achieved 6.4s transfer and passed Beijing's emission spot-check — decisive for the committee.
5. Local service presence: Our Haidian service hub guaranteed 60-minute response time within the base.
05
Our Proposal & Recommendations
We delivered an integrated "Cold-Climate Silent Fleet + Smart ATS + Centralized IoT Platform + Lifecycle Service" solution:
| Dimension | Core Recommendation | Value Proposition |
|---|---|---|
| Capacity Standardization | 23 units tiered at 200 / 400 / 800 kVA (Perkins-powered, silent canopy, IP23), each with 8-hour base tank and 25% load headroom. | Unified spare-parts inventory; right-sized per building type. |
| Cold-Climate Package | Engine block heater, battery thermal blanket, fuel-line recirculation heater, synthetic oil, and insulated canopy as standard. | Guaranteed start at -20°C within 10 seconds. |
| Fast ATS & Monitoring | DeepSea DSE8610 controller + Schneider ATS; IoT gateway pushing real-time data to a centralized cloud dashboard for the base property manager. | 6.4s average transfer; single-pane-of-glass fleet visibility. |
| Emission & Acoustic | DOC+DPF+SCR after-treatment (GB 20891-2022 Stage-V); sound-attenuated canopy ≤68 dB(A) at 7m. | Full Beijing EPA & nighttime noise compliance. |
| Service Model | SLA: 60-min response, 4-hour fix; quarterly preventive maintenance; 24/7 hotline; spare parts stocked in Haidian hub. | Predictable O&M cost; minimal critical-load exposure. |
06
Execution & Implementation
- Phase 1 — Master planning: Produced a base-wide deployment map, prioritizing the data center (B7) and biotech lab (C3) for first-phase installation.
- Phase 2 — Civil & plinth works: Poured 23 vibration-isolated reinforced plinths with cable conduits and earthing grids, coordinated with the base's weekend maintenance windows to avoid tenant disruption.
- Phase 3 — Delivery & placement: Units delivered in three batches and positioned with mobile cranes during low-occupancy periods; cold-climate packages pre-installed at the factory.
- Phase 4 — ATS & commissioning: Installed ATS panels and ran interconnection cables; each unit underwent a -20°C simulated cold-start and full-load endurance run. All 23 achieved <8s transfer.
- Phase 5 — IoT platform rollout: Onboarded all units to the centralized dashboard; property managers trained on alert configuration and monthly report export.
- Phase 6 — Training & handover: Two-day hands-on workshop for the base O&M team covering cold-start override, daily checks, and emergency procedures; delivered a complete digital O&M manual.
07
Final Results & Outcomes
After one full winter season and 14 months of operation, the project delivered outstanding results:
Cold-Start Success
100%
All 23 units at -18°C, <8s start
Avg. Transfer Time
6.4s
Grid loss to full load acceptance
Noise Level
68 dB
At 7m — within Beijing Class-1 limit
Critical Loads Protected
23 / 23
Zero cold-storage / data loss incidents
- ✓Winter resilience proven: During Beijing's January cold snap (-18°C), all 23 units auto-started within 8 seconds — zero failures, zero cold-storage or data loss.
- ✓Faster than specification: Average 6.4s transfer beat the 8s tender requirement by 20%.
- ✓Full environmental compliance: Post-installation tests at 68 dB and Stage-V emissions passed Beijing EPA audit with zero violations.
- ✓Unified fleet management: Property managers monitor all 23 units from one dashboard; 5 potential faults resolved pre-emptively via predictive alerts.
- ✓Reference-site effect: The base became a flagship reference site for Zhongguancun Science City, attracting 3 neighboring parks to adopt the same standardized backup-power model.
08
Client Testimonial
"Managing 23 generators across the base used to mean constant fire drills — especially in Beijing winters. Now the entire fleet is standardized, centrally monitored, and proven to start reliably even at -18°C. The cold-climate package and 6-second transfer have given our data center and biotech tenants complete confidence. It's the backbone our science park needed." — Director of Facilities, Yongfeng Industrial Base Property Management Office
Confidential · For internal use and client presentation only · © 2026
Case grouping
- Solution for Power Guarantee in Communication System
- NovArk Power Diesel Generator Set Financial System Power Guarantee Solution
- NovArk Power supply guarantee solution for large construction enterprises
- NovArk Power Medical System Power Security Solution
- NovArk Power Security Solution for Computing Power Center
- NovArk Power supply guarantee solution for large construction
Are you looking for a reliable manufacturer?
We can quickly provide customers with market analysis, technical support and customized services.Power That Never Stops
When Darkness Falls, NovArk Powers Through
Our company was established in 2013 and consists of four branches nationwide. As one of the leading OEM manufacturers of diesel generators in China, we have earned a strong reputation and multiple awards over the years, meeting diverse requests from markets around the world.