Professional Generator Set Manufacturer

Home / All / Solution for Power Guarantee in Communication System / Solution for Power Guarantee in Communication System

Solution for Power Guarantee in Communication System

Update Time:2026/9/1 14:04:29
Solution for Power Guarantee in Communication System
Solution for Power Guarantee in Communication System

NovArk Power Solution for Power Guarantee in Communication System

Full scene adaptation, zero interruption communication, intelligent compliance operation and maintenance

Overview: Stable communication, signal is the lifeline

In the communication system scenario, power is the lifeline for base station signal coverage, data center operations, and core switching center scheduling. Frequent unit failures in extreme environments (high mountains/coastal/desert), asynchronous parallel connection of multiple units in the core computer room, fluctuations in overseas node power grids and compliance pressures, a single power outage may lead to communication interruption (operator fines over one million yuan), and core business paralysis.

NovArk Power is deeply committed to communication scenarios, with "environmental weather resistance, zero interruption power supply, intelligent cost reduction, scenario adaptation, and global compliance" as its core, providing one-stop diesel power generation solutions for base stations, data centers, core exchange centers, and overseas communication nodes, safeguarding communication continuity and operational efficiency.

Key question: Is your communication project facing these challenges?

Risk of power supply stability

Frequent unit failures in extreme environments (-30℃ low temp, salt spray, high dust). Voltage deviation >±5% in core rooms. Grid fluctuations (±15%) trigger shutdowns.

Operating cost pressure

Large-scale base stations (>100 units) face mixed oil ratio difficulties. Annual maintenance costs exceed 200,000 yuan with high manual OPEX.

Difficulty in scene adaptation

Limited space in urban base stations (no lifting openings). Noise/emission complaints. Cumbersome transport increases failure rate by 30%.

Compliance & Installation

Noise (>75dB) and NOx exceed standards. Lack of CE/UL certification limits bidding. Rugged terrain complicates installation.

Solution: NovArk Power Communication System Five Core Systems

Environmental Weather Resistance Adaptation

Low Temperature (-30℃)

Electric heating plug + dual battery redundancy + intake preheating. 10s start-up.

Coastal Salt Spray

316L stainless steel + three-proof paint. Lifespan extended to 10 years.

Desert High Dust

Triple dust prevention + positive pressure cabin. Suitable for PM10 > 600μg/m³.

Zero Interruption Power Supply

Intelligent Parallel Control

Voltage deviation ≤ ±2%, load error ≤ ±3%, N+1 redundancy support.

Millisecond Switching

≤ 8ms switch to unit power. Seamless UPS connection for core switches.

Wide Voltage Input

Supports 380V ±15% grid fluctuations for overseas long-distance supply.

Intelligent Operation and Maintenance Cost Reduction

4G Cloud O&M Platform

Real-time monitoring via mobile app. AI predicts failures 7 days in advance.

Mixed Oil Management

Automatic proportioning of diesel/biodiesel. Prevents equipment deterioration.

Low-Cost Maintenance

Spare parts at cost price. Remote diagnosis reduces on-site visits by 90%.

Product Series & Scenario Selection Guide

Model Power (kW) Application Core Features Protection / Noise
NovArk-C50 50 Urban Small Base Stations Compact soundproof, basic vibration isolation, one-click start IP55 / ≤68dB
-10℃~40℃
NovArk-C200 200 Field Base Stations / Data Centers Quadruple dust-proof, intelligent parallel, remote monitoring IP66 / ≤65dB
-30℃~50℃
NovArk-C500 500 Core Exchange / Overseas Nodes N+1 redundancy, DPF+SCR, multi-voltage switching IP66 / ≤62dB
-30℃~50℃

Industry Case Validation

Xizang Plateau

Alpine Extreme Environment

Altitude 4500m, -25℃ low temp, high dust. Deployed 50 units of NovArk-C200.

Achievement

Zero communication interruptions for 2 years. Saved 800,000 yuan in annual fines.

Hainan Coastal

Salt Fog & Noise Control

600mg/m³ salt spray. 316L stainless steel + parallel control solution.

Achievement

Noise reduced to 62dB(A). Passed environmental acceptance with zero downtime.

Africa Node

Overseas Compliance

Grid fluctuations ±15%. CE/SONCAP certified NovArk-C500 International Edition.

Achievement

Won 3 projects. 25% reduction in annual O&M costs.

FAQ

Q: Difficulty in transporting outdoor base stations, how can the crew enter the site?

A: We provide a "modular splitting solution". The unit is split into a power unit (≤300kg), control module, and heat dissipation unit for manual transport and bolt-together assembly on-site.

Q: What to do if multiple units in the core computer room are connected in parallel and not synchronized?

A: Equipped with a deep-sea parallel controller, it automatically distributes the load (voltage deviation ≤ ±2%) and eliminates the risk of circulating current.

Q: How to solve complaints about high noise levels in urban base stations?

A: Adopting the design of "compact soundproof box + labyrinth muffler", noise is ≤65dB(A) at 1 meter, fully compliant with GB 3096 standards.

Safeguard Your Communication Continuity

NovArk Power delivers industrial-grade resilience for global telecom infrastructure.