China Gold Group Construction Co., Ltd. — Jiama Copper Polymetallic Mine Yulongbu Tailings Storage Facility PC Project

China Gold Group Construction Co., Ltd. — Jiama Copper Polymetallic Mine Yulongbu Tailings Storage Facility PC Project
China Gold Group Construction Co., Ltd. — Jiama Copper Polymetallic Mine
Yulongbu Tailings Storage Facility PC Project
Yulongbu Tailings Storage Facility PC Project
Mobile Diesel Generator Sets (Weather-Proof Type) — Case Study
From High-Altitude Power Vulnerability to All-Weather Mobile Backup Assurance
01
Project Background & Situation Before We Engaged
The Jiama Copper Polymetallic Mine, operated under China Gold Group Construction Co., Ltd., is a large-scale polymetallic mining operation in Tibet. The Yulongbu Tailings Storage Facility (TSF) is a critical hazard source whose safe operation directly affects downstream ecological security and mine continuity. The PC (Procurement & Construction) project required reliable mobile power for construction phases, dewatering pumps, monitoring systems, and emergency response — all at an altitude exceeding 4,300 meters.
Before we engaged, the project faced severe power challenges:
- Extreme plateau environment: At 4,300 m, thin air, extreme temperature swings (-25 °C to 25 °C), and intense UV radiation caused ordinary generator sets to lose up to 35 % of rated power and suffer frequent hard starting.
- No weather protection: Open-frame rental units offered no rain or snow shelter. Snowstorms and heavy rainfall repeatedly shorted control panels, leaving dewatering pumps dead during critical rainstorms.
- Immobile & slow deployment: Fixed units could not follow the advancing construction front. Relocating power meant half a day of manual handling, delaying the TSF construction schedule.
- Environmental & safety risk: Raw exhaust and oil leakage onto the plateau tundra risked violating environmental red lines, while tailings dam instrumentation losing power posed a major safety hazard.
- Chaotic management: Mixed-vendor rentals with no maintenance records left project leaders with zero visibility into runtime hours, fuel use, or unit health.
02
Tender Purpose & Bidding Process
Tender Objectives
The PC project launched this procurement with the core goals of "plateau adaptability, weather-proof reliability, mobility, environmental compliance, and intelligent oversight." Key requirements included:
- ✓Rated power with no less than 90 % output retention at 4,300 m altitude and -25 °C cold start capability.
- ✓IP55-level weather-proof enclosures with certified rain/snow resistance.
- ✓Trailer-mounted / skid-mounted mobility for rapid redeployment across the construction front.
- ✓Compliance with plateau ecological protection and tailings safety monitoring power-supply standards.
Bidding Process
- Pre-qualification: Only manufacturers with mining/mobile generator references above 4,000 m and valid OEM authorization passed.
- Technical bid: Scored on plateau derating data, weather-proof certification, mobility design, ATS option, and cold-start scheme.
- On-site demonstration: Shortlisted bidders tested units at a Lhasa logistics yard at 3,650 m; we delivered the only unit starting within 8 seconds at -18 °C.
- Commercial & award: Within the control price, our "plateau mobile weather-proof package + SLA" scored highest overall and was awarded the contract.
03
Post-Award Objectives
Beyond simply supplying equipment, the client aimed to establish "all-weather mobile power assurance for the entire Yulongbu TSF construction zone":
- ✓Guarantee uninterrupted power for dewatering and tailings dam safety instrumentation under any weather.
- ✓Enable one unit to flexibly follow multiple construction points, eliminating redundant purchases.
- ✓Build a unified, traceable fleet management system for the project's entire generator inventory.
04
Why They Found Us
1. Plateau track record: We had delivered weather-proof mobile units to mining projects above 4,500 m on the Qinghai-Tibet plateau.
2. Deep load understanding: We understood the pulsed startup of dewatering pumps and the zero-tolerance power requirement of dam safety sensors.
3. Free pre-audit: We provided a no-cost altitude derating calculation and site layout plan before bidding.
4. Verified cold-start proof: Our on-site demo at 3,650 m was the only one meeting the -18 °C / 8-second start criterion.
5. Full lifecycle commitment: A 5-year SLA with a Lhasa spare-parts depot and 4-hour remote plateau response.
05
Our Proposal & Recommendations
We delivered an integrated "Plateau Power + Weather-Proof + Mobility + Intelligent Management" solution:
| Dimension | Core Recommendation | Value Proposition |
|---|---|---|
| Plateau Adaptability | Turbocharged engines with altitude-compensated fuel mapping; -25 °C glow-plug preheating and synthetic cold-start oil. | >90 % power retention at 4,300 m; reliable cold starts. |
| Weather-Proof Design | IP55-rated all-steel canopy with double-slope rain roof, sealed control cabinet (IP65), UV-resistant cable glands. | Operational in blizzards and heavy rain; no panel short circuits. |
| Mobility | Trailer-mounted with off-road tires & tow bar + skid-mounted backup; single-point lifting hooks for crane moves. | Redeploy to any construction point within 2 hours. |
| Auto-Start & ATS | Optional ATS module for mains-loss auto-start in 3–8 s, prioritizing dam safety & dewatering loads. | Zero interruption for critical safety systems. |
| Eco & Fuel System | DPX silencer, oil containment sump, 72 h dual-wall fuel tank with spill-proof coupling. | Protects fragile plateau ecosystem; meets environmental red lines. |
| Smart Fleet Management | IoT module reporting location, runtime, fuel level & fault codes to the project HQ dashboard. | One-screen fleet visibility; proactive maintenance. |
06
Execution & Implementation
- Altitude commissioning: Upon arrival at 4,300 m, we re-tuned the ECU for thin-air combustion and conducted a 72 h load-run to validate the 90 % power retention claim.
- Weather-proof verification: We performed simulated rain/snow spray tests on the canopy seals and confirmed IP55 integrity before handover.
- Mobility drill: Demonstrated relocation from the dewatering station to the dam crest via trailer tow in under 2 hours, witnessed by the project owner.
- ATS integration: Connected the units to the tailings dam safety monitoring cabinet with auto-failover, tested via simulated mains-loss drills.
- Personnel training: Trained operators on plateau-specific cold-start, canopy maintenance, and IoT dashboard use; issued bilingual (CN/EN) SOP cards.
- O&M regime: Quarterly on-site inspections plus remote diagnostics from our Lhasa service center, with a 4-hour response commitment.
07
Final Results & Outcomes
Power Retention @ 4,300 m
92%
Exceeded the 90 % tender requirement.
Cold-Start Time
7.4 s
At -20 °C, within the 8 s target.
Weather-Proof Rating
IP55
Zero rain/snow-induced outages.
Env. Compliance
100%
No oil leaks or emissions violations.
- ✓Uninterrupted safety monitoring: Dam instrumentation retained continuous power through two major snowstorms, with zero tailings safety incidents.
- ✓Schedule protection: Mobile redeployment kept dewatering pumps online, avoiding an estimated 18 days of weather-related construction delay.
- ✓Fleet efficiency: One mobile unit covered 4 construction points, reducing the planned purchase quantity by 3 sets and saving approx. 25 % in capital cost.
- ✓Audit-ready: IoT runtime and fuel records made environmental & safety inspections fully traceable.
08
Client Testimonial
"On this plateau, a tailings dam cannot afford even a second of lost power. These weather-proof mobile units have become our most reliable safeguard — rain, snow, or freezing night, the dewatering and monitoring systems never go dark. That is true peace of mind." — Project Manager, Yulongbu Tailings Storage Facility PC Project
Confidential · For internal use and client presentation only · © 2026 · Case Study — Jiama Mine Yulongbu TSF Mobile Weather-Proof Diesel Generator Project
Case grouping
- Solution for Power Guarantee in Communication System
- NovArk Power Diesel Generator Set Financial System Power Guarantee Solution
- NovArk Power supply guarantee solution for large construction enterprises
- NovArk Power Medical System Power Security Solution
- NovArk Power Security Solution for Computing Power Center
- NovArk Power supply guarantee solution for large construction
Are you looking for a reliable manufacturer?
We can quickly provide customers with market analysis, technical support and customized services.Power That Never Stops
When Darkness Falls, NovArk Powers Through
Our company was established in 2013 and consists of four branches nationwide. As one of the leading OEM manufacturers of diesel generators in China, we have earned a strong reputation and multiple awards over the years, meeting diverse requests from markets around the world.